| 1. | Approximate formula for normal water depth of u - type channel 形渠道正常水深的近似计算公式 |
| 2. | The optimum normal water level is decided by the hamming approach degrees of each plan 以待选方案与最优方案间的海明贴近度来决策水库正常高水位。 |
| 3. | Under normal water and drought condition mosuchun can raise photosynthetic rate and water use efficiency ( wue ) 正常和干旱条件下摩素淳能明显提高光合速率和水分利用效率,促进有机物质的积累。 |
| 4. | When kidney - qi is sufficient and its astringency is right , the urinary bladder will open and close regularly , thus maintaining normal water metabolism 肾气充足,则固摄有权,膀胱开合有度,从而维持水液的正常代谢。 |
| 5. | The safety factors of the most likely sliding paths are 4 . 15 and 3 . 05 for 9b and 4b respectively at normal water storage level 另外,坝踵以下14m深度范围向下游阶梯式滑出也是安全系数较小的滑移路径,但不是控制路径。 |
| 6. | The mixture of natural and reclaimed water is then subject to normal water treatment before it is distributed as drinking water for the community 将饮用水分到社区前,使自然与再开发的水源混合,是下一个正规水处理的目标。 |
| 7. | After the three gorge reservoir , the yangtze river storing water to 175m ? ts normal water level , almost the whole fengjie city would be submerged 长江三峡水库正常蓄水175m后,奉节旧县城几乎将会被全部淹没,需全部搬迁。 |
| 8. | Make water - saving policy and medium - term and long - term plans , responsible for water - saving technological transformation and facility construction of normal water , confirm working 制定节水政策和中长期规划,负责节水技改和中水设施建设验收工作。 |
| 9. | Some utilization projects of roof runoff water were also discussed including bringing it into normal water system , independent rainwater utilization system , roof virescence system and infiltration and irrigation system 讨论了屋面径流的几种利用方案,主要包括纳入中水系统、独立的雨水利用系统、屋面绿化利用系统和渗透回灌系统。 |
| 10. | We draw the conclusions as follows from prediction results : the total salinity of groundwater will slightly increase compared with present mean value , when the irrigation water amount is reduced 10 % of present normal water quantity in the 2005 从预测结果看, 2005年在引水量减少10的情况下,试区的地下水矿化度较目前多年平均值略有升高。 2010年,当引水量减少30时,地下水矿化度在不同时期有较大幅度上升,值得引起注意。 |